Water Arrigation Automation

Comprehensive and integrated "Supervisory Control and Data Acquisition" With SCADA, automatic control and monitoring of all units from control of all equipment belonging to a plant or business to production planning, environmental control units, assistant control. Comprehensive and integrated "Data Supervisory Control and Data Acquisition (SCADA) "is the complete control and monitoring of all units, from control of all equipment belonging to a plant or business to production planning, environmental control units, Thanks to these regulations; it is a new comprehensive system that allows us to observe the activities of past events again and again at the date and time of day by hiding the events and alarms. Because of the "layer" features that make up this system structure, it enables all enterprises to gradually implement all control needs.
 
Drinking Water Distribution and Control Systems
 
Matek Automation; Line Hydraulics, Water Wells, Water Depot and Pump Upgrade Automation and SCADA; PLC, RTU Supervised Automation Systems, GPRS, Radio, Telemetry, Wi-Fi, Radio Modem, Deep Well Automation, Scada systems are designed, produced, assembled and serviced. The SCADA system, which is designed with ABB RTU, PLC, DCS, provides easy configuration and easy installation.
 
Key Features:
 
Depending on the running time of the pumps, it is possible to switch in and out, to enter and exit the circuit at the desired speed, or to have a backup operation and similar configurations. It is possible to record alarms according to the profile of the pressure and flow change of each incoming pump according to the bed and stator operation, leaving the pumps disconnected and replacing the least used pump in the sequence (or backup). The communication between the water well or water spring centers and the water station and the pump station can also be provided by radio, wire and fiber optic structures.
 
All operations are complete. Thanks to these regulations; it is a new comprehensive system that allows us to observe the activities of past events again and again at the date and time of day by hiding the events and alarms. Because of the "layer" features that make up this system structure, it enables all enterprises to gradually implement all control needs.